Horn and Reflector pulsing in final configuration - 3 March 2006

Following the installation of the powering systems at the surface, the pulse transformers in the service gallery and the horn and reflector in the target chamber, first tests with power have been performed. The reflector was first used with nominal 180 kA double-pulses on 28 February, the horn was pulsed with 150 kA double pulses on 2 March. No interferences were observed when pulsing both systems together on 2 and 3 of March. A report on these tests is available (in French).