Reflector installation September / December 2005
   
 

 

 

 

 

 

 

5 September 2005: Transport test with wooden model of reflector

   
 

 

 

 

 

 

 

5 September 2005: Transport test with reflector model through access gallery

   
 

 

 

 

 

 

 

1 December 2005: Reflector lower support frame installed (view in beam direction)

   
 

 

 

 

 

 

1 December 2005: Reflector lower support frame installed (foreground: outer cylinder of the automatic water connector)

   
 

 

 

 

 

 

 

2 December 2005: Reflector transport from assembly lab to BHA4 surface building

   
 

 

 

 

 

 

 

5 December 2005: Reflector installed on transport vehicle

   
 

 

 

 

 

 

 

5 December 2005: Reflector transport into first meters of access gallery

   
Additional photos of the reflector transport  
   
 

 

 

 

 

 

 

5 December 2005: Reflector transport along the access gallery

   
 

 

 

 

 

 

 

5 December 2005: Reflector arrival in target chamber TCC4

   
 

 

 

 

 

 

 

 

 

5 December 2005: Reflector transport by crane along the target station side shielding

   
 

 

 

 

 

 

 

 

 

5 December 2005: Reflector installation on lower support frame

   
 

 

 

 

 

 

 

5 December 2005: Reflector installation on lower support frame

   
 

 

 

 

 

 

 

13 December 2005: Work on support for stripline (in trench near reflector)