CERN AC Note (2000-03)-General description of the CNGS Project

3. Underground structures

cb.jpg (2249 bytes)

Figure 11: Works connected with the CNGS project: section
cb.jpg (2249 bytes)

Figure 12: Underground work-sites at Point BA4 of the SPS. Tunnel TI8, under construction, will connect the SPS to the LHC.
cb.jpg (2249 bytes)

Previous Table of contents Page 21

Next