CERN AC Note (2000-03)-General description of the CNGS Project
3. Underground structures
Figure 11:
Works connected with the CNGS project: section
Figure 12: Underground work-sites at Point BA4 of the SPS. Tunnel TI8, under construction, will connect the SPS to the LHC.
Previous
Table of contents
Page 21
Next