News

 

3/12/2012

End of CNGS run

6-10/11/2012

8th NBI2012 workshop at CERN

31/05/2010

First tau-neutrino candidate detected

Project Overview Beam Performance CNGS↔LNGS Publications/Talks Events Links
Technical Page (EDMS) Civil Engineering Naming Conventions Download Pictures Planning Search
 
Project Organization:  Secondary Beam WG, Project Team, Technical WG, Commissioning WG
download.jpg (14161 bytes)
fig06_dp.jpg (11124 bytes)
CNGS set-up at CERN in map form
English version / 09-2000
[jpg]  (531k)
[eps]  Postscript (375k)
[pdf]   Acrobat 4 (37k)
Official CNGS logo [jpg]  (955k) 19x16cm 300dpi
[jpg]  (280k) 7x6cm 300dpi
[jpg]  (88k)   2.5x3cm 300dpi
[eps]  Postscript (375k)
Project Schedule
Version  26-07-2002
[jpg]  (1000k)
[pdf] Acrobat 4 (63k)
_
_
fig05_dp.jpg (5757 bytes)
Neutrino beam trajectory
English version / 09-2000
[jpg]  (215k)
[eps]  Postscript (495k)
[pdf]   Acrobat 4 (112k)

Underground structures at CERN
English version / 06-2003
[jpg307k
[jpg1.1M
_
_

Underground structures at CERN [jpg
CNGS underground structures near point 4 of SPS
English version / 06-2001
[jpg]  (340k)
CNGS underground structures - target chamber area
English version / 06-2001
[jpg]  (307k)

CNGS underground structures - target chamber area with names
 
[jpg]  (307k)
CNGS underground structures -
hadron stop / muon detector area,
English version / 06-2001
[jpg]  (350k)

CNGS underground structures -
hadron stop / muon detector area,
with names of galleries and caverns
[jpg]  (350k)
Works connected with the CNGS project: section
Coupe verticale des ouvrages du projet CNGS
Version  09-2000
[jpg]  (239k) English version
[eps]  (327k) English version
[jpg]   (241k) Version Fran�aise
[eps] (327k) Version Fran�aise