News

 

3/12/2012

End of CNGS run

6-10/11/2012

8th NBI2012 workshop at CERN

31/05/2010

First tau-neutrino candidate detected

Project Overview Beam Performance CNGS↔LNGS Publications/Talks Events Links
Technical Page (EDMS) Civil Engineering Naming Conventions Download Pictures Planning Search
 
Project Organization:  Secondary Beam WG, Project Team, Technical WG, Commissioning WG

Production of MBG deflection magnets
for the CNGS proton beam line TT41

(pictures courtesy of K. Schirm, CERN)

MBG lamination stamping MBG lamination mixing

MBG lamination stamping.jpg (471792 bytes)

MBG lamination mixing.jpg (423508 bytes)

MBG stacking half cores

MBG stacking half cores 1.jpg (50760 bytes)

MBG stacking half cores 2.jpg (416624 bytes)

MBG coil

MBG_coil_1.jpg (453004 bytes)

MBG_coil_2.jpg (33053 bytes)

MBG cores

MBG cores.jpg (452940 bytes)

MBG assembly and test

MBG assembly and test 1.jpg (421736 bytes)

MBG assembly and test 2.jpg (258570 bytes)

   

M BG assembly and test 3.jpg (366463 bytes)

MBG assembly and test 4.jpg (415667 bytes)