Transport of the exit flange for the decay tube

The 50 mm thick, 2.5 m diameter exit flange to close the decay tube at its downstream end had to be transported to the hadron stop area before the start of the decay tube installation. A drawing of this exit flange can be found on EDMS: https://edms.cern.ch/file/365046/1/SPSX_8089_2101.hpgl

This transport operation took place, with some difficulties, on 21 October 2003.