Reflector installation | September / December 2005 |
![]() |
5 September 2005: Transport test with wooden model of reflector |
![]() |
5 September 2005: Transport test with reflector model through access gallery |
![]() |
1 December 2005: Reflector lower support frame installed (view in beam direction) |
![]() |
1 December 2005: Reflector lower support frame installed (foreground: outer cylinder of the automatic water connector) |
![]() |
2 December 2005: Reflector transport from assembly lab to BHA4 surface building |
![]() |
5 December 2005: Reflector installed on transport vehicle |
![]() |
5 December 2005: Reflector transport into first meters of access gallery |
Additional photos of the reflector transport | |
![]() |
5 December 2005: Reflector transport along the access gallery |
![]() |
5 December 2005: Reflector arrival in target chamber TCC4 |
![]() |
5 December 2005: Reflector transport by crane along the target station side shielding |
![]() |
5 December 2005: Reflector installation on lower support frame |
![]() |
5 December 2005: Reflector installation on lower support frame |
![]() |
13 December 2005: Work on support for stripline (in trench near reflector) |