News

 

3/12/2012

End of CNGS run

6-10/11/2012

8th NBI2012 workshop at CERN

31/05/2010

First tau-neutrino candidate detected

Project Overview Beam Performance CNGS↔LNGS Publications/Talks Events Links
Technical Page (EDMS) Civil Engineering Naming Conventions Download Pictures Planning Search
 
Project Organization:  Secondary Beam WG, Project Team, Technical WG, Commissioning WG
 
 
Project Description
2006
Doors and Keys in the CNGS facility
2004
Report of the CNGS Review Committee (June 2004)
2004
CNGS progress report 2004
L. Bruno et al., AB-Note-2004-063-CNGS
2004
An updated calculation of neutron fluence in the CNGS first muon pit,
A. Ferrari, A. Guglielmi, P.R. Sala
2003
CNGS layout and systems: a progress report, 
L. Bruno et al., AB-Note-2003-060-CNGS (June 2003)
2003
Report of the CNGS Review Committee (May 2003)
2002
CNGS muon monitoring: Why do we need both muon detector stations at the start-up of the CNGS neutrino beam?
A.E. Ball et al., note CERN-SL-2002-040 EA
2002
Report of the CNGS External Review Committee, with comments by the CNGS project team (February / April 2002)
2002
Update of changes to CNGS layout and parameters,
M. Cl�ment et al., note CERN-SL-2002-012
2001
CNGS: Effects of possible alignment errors,
A.E. Ball et al., CERN-EP-2001-037/CERN-SL-2001-016 EA
2000
CNGS: Update on secondary beam layout,
A.E. Ball et al., SL-Note-2000-063 EA
2000
General Description of the CNGS project
1999
The CERN Neutrino beam to Gran Sasso (NGS) (Addendum to report CERN 98-02, INFN/AE-98/05), R. Bailey et al., CERN-SL/99-034(DI), INFN/AE-99/05
1998
The CERN Neutrino beam to Gran Sasso (Conceptual Technical Design), Ed. K. Elsener, CERN 98-02, INFN/AE-98/05
1992
CERN Beams for Long Baseline Neutrino Experiments, A. Ball et al., CERN SL/Note 92-75 (BT)